The professional technical team gives the best design scheme on the basis of repeated design demonstrations, laying the foundation for good product quality.
Experienced technicians and assembly workers follow strict process standards for production, and each process transfer includes self-inspection and random inspection.
Finally, the most experienced testers will conduct field tests on the overall performance of the vehicle before leaving the factory. After the road test and the working condition test, various details must be carefully inspected. After painting, there is a final inspection before it can be put into storage.
XDCY-2 2m³ diesel scooptram with remote control
Construction of culvert in Georgia Hydropower Station XDCY-15
XDCY-1A in Arequipa ,Peru
XD928 in Nepal hydro power project